Dear all,
I proposed to Wolf to merge the ATLAS II
and the Capacity Building surveys for the following reasons:
·
Both
surveys are urgent since both are needed for the Summit II
·
If not
merged, they will be distributed in the same period, which will produce a
confusion and may lead to inconsistent answers or very few ALSes responding
·
The only disadvantage
of merging them is that it will result in a very long survey that may
discourage the ALSes to go through it.
·
The
proposal is to conceive a survey of 3 parts:
o Section 1: ALS Details
o Section 2: Part dedicated to ATLAS II WG
o Section 3: Part dedicated to Capacity Building
WG
·
Section 1
will be very short to provide up to date contacts and languages used
·
Section 2
will be finalized by the ATLAS II survey sub-group
·
Section 3
will be a very short part for Capacity Building
To make things practical, I’m
proposing in the attached file:
·
What the CB
WG thinks it could be section 1
·
Section 3
as shortened by a small team in the CB WG (Dev, Carlos and myself).
I want to remind you that for the ATLAS II
summit, the ALSes need to be prepared for an effective and efficient participation,
and the CBWG is in charge of such preparation. That’s why the CBWG needs
this section of the survey.
--------------------------------------------------------------------------------
Tijani BEN JEMAA
Executive Director
Mediterranean
Federation of Internet Associations (FMAI)
Phone: + 216 41 649 605
Mobile: + 216 98 330 114
Fax:
+ 216 70 853 376
--------------------------------------------------------------------------------