As
to ensuring the RAP remain in place post selection new IFO: The RAP is a procudure between CSC and PTI (& ICANN) on how to deal with cetain performance issues. Introducing an obligation to ensure adoption by a new IANA Function Operator is well beyond the
limited scope of the Remedial Action Procedures and limited role of the CSC, and should therefore not be included. It is suggested that If it ever comes to a situation that a new IFO needs to be appointed, the requirement that the RAP should remain in place
should be dealt with through the new contract between parties, and the appropriate consultation mechanisms.