Is the underlying message "RSSAC thinks IANA should be prepared with a length change plan?"  or is it "if IANA wants to change the length RSSAC wants a chance to review the plan?"


The first.  Possibly with the words "sometime soon" thrown in there.

--
Wes Hardaker
USC/ISI