Sept. 30, 2015
9:18 p.m.
Alan Greenberg writes:
There is no doubt that the requirement to amend or replace the RZMaintainer Cooperative Agreement to ensure that post-transition, Verisign will be oblidged to implement changes passed on by IANA. But the Verisign/ICANN proposal was not a vehicle for this . That proposal is solely about how to logistically eliminate NTIA approvals at the moment of transistion, and not introduce any risk, and specifically not require any coding changes into the process (at that point in time).
That was my reading of the proposal as well. A proposal to ensure that the results are the same when the NTIA drops out of the protocol and make sure that the communication keeps flowing. jaap