“If the load-time metric is unavailable, it should not be listed.” I think this is good. In the case where you see”the new zone SN but are unable to determine the load-time, a value of “-1” seems just about as useful as having no entry at all. A failed load of a zone is interesting, but the lack of a load time is not necessarily the same as a failed load. Ken Renard S&TCD Contractor – ICF Sustaining Base Network Assurance Branch C5ISR Center, Space and Terrestrial Communications Directorate Office: 443-395-7809 kenneth.d.renard.ctr@mail.mil